Capital Construction Matrix for Fund 71 Criteria

This is a table of the most common determinants involved in requesting a Fund 71 speedtype.

 Description: All items must meet $75k cap threshold to be capitalized.Extend useful life of building or system?Increase productive capacity or functionality?ExpenseNotes
1PaintNNYCosmetic in nature
2Carpet replacementNNYCosmetic in nature
3Ceiling tile replacementNNYCosmetic in nature
4Light fixture replacementNNYCosmetic in nature
5Pollution remediationNNYAccrue if $75k+ per project or building
6Renovation or reconfiguration of spaceNYNe.g. moving walls, reconfiguration of space, storage to classroom or offices
7Electrical panel replacementNNYAssumes no increase in capacity or functionality
8Electrical panel upgradeNYNTypically required w/ change in space's use
9Technology improvementsNYNCampus WIFI/Ethernet project
10Fume hood replacementNNYAssumes no increase in capacity or functionality
11Fume hood additionNYNMay be required for new lab space or to address indoor air quality issues
12Window replacementYN?Necessary due to age or design deficiency; typically results in energy efficiency
13RecommissioningNN?Includes tunning of HVAC system and replacement of non-functioning parts
14Motor repairYN?Prevents premature degradation
15Pump replacementNNYAssumes no increase in capacity or functionality
16Boiler or chiller replacement or overhaulYY?Core component of a system; typically provides improved functionality
17Landscaping - basic sod or other repairsNNYRepresents restoration to original condition
18Landscaping - newNYNe.g. additions to existing land
19Sidewalk replacementYY?Considers all campus sidewalks as a single system
20Sidewalk grindingNNYAddresses safety issues associated w/ deterioration
21Fixed seating replacementNY?See movable equipment cap policy for other types of seating
22Asphalt sealing or patchingYN?Prevents premature degradation
23Athletic field replacement    
24Parking lot replacement    
25Infrastructure improvementsYYNUpgrades to tunnels, utility lines, sprinkler systems
26Roof improvementNY?Must upgrade current roof material otherwise expense
27Fates and fencing improvementsYYNUpgrade of materials or electronics
28Structural changesYYNReinforcement of floors or walls, installation of beams, rafters, joints